Rework in job costing, journal entry (continuation of 18-40). Assume that the 6 spoiled units of… 1 answer below »

Rework in job costing, journal entry (continuation of 18-40). Assume that the 6 spoiled units of Jellyfish Machine Shop’s Job #10 can be reworked for a total cost of $1,800. A total cost of $6,600 associated with these units has already been assigned to Job #10 before the rework. Prepare the journal entries for the rework, assuming the following:

a. The rework is related to a specific job.

b. The rework is common to all jobs.

c. The rework is considered to be abnormal.

 